Cleanroom & Laboratories
Owner: Biofire
Architect: FFKR
Engineer: Colvin
General Contractor: Okland Construction
Mechanical Contractor: Palmer Christiansen
BioFire is divided into three main groups of departments; Administration, Research / Development, and Manufacturing. The Administration departments include private and open office space, conference rooms, gathering spaces, and a cafeteria. The Research and Development departments consist of electronics manufacturing workshops, biochemistry labs, biosafety labs, and Engineering workshops. The Manufacturing clean-room areas are enclosed into individual portions as required with storage and assembly-line components. Also included are 350 stalls of underground parking and 400 surface stalls around the site. 270,000 SF. Salt Lake City, Utah
Thatcher Building for Biological and Biophysical Chemistry
Owner: Intermountain Healthcare
General Contractor: Big-D Construction
Mechanical Contractor: J&S Mechanical
Three story addition to existing clinic and renovation of existing facility. Required extensive coordination of multiple phases to renovate multiple areas while occupied. New construction included Insta-care, Pediatrics and General Medicine clinics.
Sorenson Molecular Biotechnology
Owner: Iasis Healthcare
General Contractor: Layton Construction
Mechanical Contractor: J&S Mechanical
60,000 square foot professional office building that was connected to the hospital. The P.O.B. mechanical system was fed through the hospital which required careful routing.