Mission Critical
OWNER: DATABANK
ARCHITECT: CORGAN
ENGINEER: kW MISSION CRITICAL
GENERAL CONTRACTOR: Layton Construction
SIZE: 250,000 Square Feet
Databank utilizes air cooled chillers and pre-manufactured pump houses to provide the cooling to Computer Room Air Handling Units and Fan Walls in their co-locate data halls. This was another fully BIM coordinated project which allowed for pre-manufacturing of the large bore mechanical piping segments at our fabrication shop for on-time delivery to the jobsite. This project was fully commissioned from level one factory witness tests through level five, the integrated systems test.
DataBank’s Granite Point SLC3 data center in Bluffdale, UT is minutes from downtown Salt Lake City. The carrier-neutral design offers network connectivity to multiple Tier 1 and Tier 2 providers, diverse substations that provide high-density power, and redundant cooling systems.
Owner: Private Owner
Architect: HKS
Engineer: POWERCOOL ENGINEERS
General Contractor: Okland Construction
Size: 250,000 SqFt.
Aligned Energy purchased a decommissioned semi-conductor plant that has been re-purposed into a co-location Data Center. The interior of the existing building was demolished to expose the structure and make room for the new white space and electric rooms. Aligned Energy’s proprietary mechanical equipment was utilized for the cooling of the whitespace. Conventional air-cooled chillers and AHU’s were utilized for the Power room cooling. 3-D scanning of the existing building allowed for precise coordination of the new mechanical systems supplying this Tier 3 data center.
Owner: eBay Inc.
Architect: SmithGroupJJR
General Contractor: Okland Construction
Mechanical Contractor: J&S Mechanical
Two buildings. Multi-level parking garage. The Marketplaces building is 192,000 SD, three-story, 1,600 employees dedicated to Customer Service, Security, Legal, and Human Resources. The Amenities building is a single-story 51,000 SD structure consisting of Reception, Gift Shop, 480-seat Auditorium, training & fitness facilities, full-service kitchen, dining area, locker rooms, and loading dock. 36-acre site. Expedited 11-month schedule